# Occulax blog — guides for factory owners and plant heads

- [5S in a Factory: Implementation Steps, Checklist and SOP (2026-11-24)](https://occulax.com/blog/5s-housekeeping-in-factory): 5S is Sort, Set in order, Shine, Standardise and Sustain. How to implement it on the shop floor, with a housekeeping checklist, daily SOP and audit scoring.
- [How to Calculate OEE: Formula, Example and Benchmarks (2026-11-24)](https://occulax.com/blog/how-to-calculate-oee): OEE = Availability × Performance × Quality. A worked shift example, the six big losses, what a good OEE is, an Excel layout and the mistakes that inflate it.
- [How to Identify Bottlenecks in Production (With Example) (2026-11-24)](https://occulax.com/blog/how-to-identify-bottlenecks-in-production): Spot a production bottleneck by where work piles up, then confirm it by calculating each station's real capacity. Worked example and the five steps to fix it.
- [How to Reduce Changeover Time in Manufacturing (SMED) (2026-11-24)](https://occulax.com/blog/how-to-reduce-changeover-time-smed): Cut changeover time with SMED: move set-up work outside the machine stop, simplify what stays inside, then standardise it. Steps, example and checklist.
- [How to Reduce Machine Downtime: Formula, Log and Plan (2026-11-24)](https://occulax.com/blog/how-to-reduce-machine-downtime): Reduce machine downtime by measuring every stop, logging reasons, catching micro-stops and fixing the top causes first. Formula, log template and a 7-step plan.
- [How to Reduce Rejection Rate in Manufacturing (With Formula) (2026-11-24)](https://occulax.com/blog/how-to-reduce-rejection-rate): Rejection rate = rejected ÷ total produced × 100. Formula, PPM, first-pass yield, rework vs scrap, root-cause tools and a step-by-step plan to cut rejection.
- [Manufacturing Cost per Unit: Formula and Worked Example (2026-11-24)](https://occulax.com/blog/manufacturing-cost-per-unit): Cost per unit = total manufacturing cost ÷ good units produced. Formula, fixed vs variable cost, a worked ₹ example, and how hidden losses raise cost per part.
- [Takt Time vs Cycle Time vs Lead Time: Formulas and Example (2026-11-24)](https://occulax.com/blog/takt-time-vs-cycle-time): Takt time is the pace demand requires; cycle time is how long a step takes; lead time is order to delivery. Formulas, a worked example and line balancing.

Source: https://occulax.com/blog

---

Start a 14-day pilot: https://occulax.com · Email: pilot@occulax.com · Phone: +91 80 4920 1800 · Site map: https://occulax.com/llms.txt
