OEE = Availability × Performance × Quality. A worked shift example, the six big losses, what a good OEE is, an Excel layout and the mistakes that inflate it.

By Occulax team

Diagram of a shift's planned time shrinking through availability, performance and quality losses down to fully productive time
On this page
  1. What is OEE in manufacturing?
  2. What is the OEE formula?
  3. How do you calculate OEE? A worked example
  4. What are the six big losses?
  5. What is a good OEE? Is 85% world class?
  6. How do you calculate OEE in Excel?
  7. What are the common OEE mistakes?
  8. What is the difference between OEE and TEEP?
  9. How can you measure OEE automatically with the cameras you already have?
  10. Frequently asked questions

Overall Equipment Effectiveness (OEE) tells you how much of the time you planned to run a machine was actually spent making good parts at full speed. It is the single most useful number for a machine or line, because it rolls stoppages, slow running and rejections into one percentage, and then lets you split it back apart to see where the time went.

Quick answer OEE = Availability × Performance × Quality. Availability is run time ÷ planned production time, Performance is (ideal cycle time × total count) ÷ run time, and Quality is good count ÷ total count. A shortcut gives the same answer: OEE = (good count × ideal cycle time) ÷ planned production time. An OEE of 85% is the widely cited "world-class" benchmark.

What is OEE in manufacturing?

OEE compares what a machine actually produced with what it could have produced if it ran the whole planned time, at its ideal speed, with zero rejects. It came out of Total Productive Maintenance (TPM), the approach developed in Japan and popularised by Seiichi Nakajima.

It has three parts, and each one captures a different kind of loss:

  • Availability — time lost to stops (breakdowns, changeovers, waiting for material).
  • Performance — time lost to running slower than ideal, including short stops nobody writes down.
  • Quality — time lost making parts that are scrapped or reworked.

Multiply the three and you get OEE. Because it is a product, a line that looks fine on each factor (say 90% each) still only reaches about 73% overall.

What is the OEE formula?

Factor Formula What it measures
Planned production time Shift time − planned breaks Time you intended to run
Run time Planned production time − stop time Time the machine actually ran
Availability Run time ÷ Planned production time Losses from stops
Performance (Ideal cycle time × Total count) ÷ Run time Losses from slow running and minor stops
Quality Good count ÷ Total count Losses from scrap and rework
OEE Availability × Performance × Quality Overall effectiveness

Ideal cycle time is the fastest the machine can reliably make one part under good conditions — not a figure someone negotiated as a target. If you do not know it, use the nameplate or design rate, or the best sustained rate you have seen over a full hour.

How do you calculate OEE? A worked example

Take one 8-hour shift on a CNC machine. These are illustrative numbers.

  • Shift length: 480 minutes
  • Planned breaks (lunch and tea): 30 minutes
  • Stops: a 32-minute breakdown and a 22-minute changeover, so 54 minutes in total
  • Ideal cycle time: 0.5 minutes (30 seconds) per part
  • Total parts made: 666
  • Rejected or reworked parts: 18, so 648 good parts
Step Calculation Result
Planned production time 480 − 30 450 min
Run time 450 − 54 396 min
Availability 396 ÷ 450 88.0%
Performance (0.5 × 666) ÷ 396 = 333 ÷ 396 84.1%
Quality 648 ÷ 666 97.3%
OEE 0.880 × 0.841 × 0.973 72.0%

Check it with the shortcut: (648 good parts × 0.5 min) ÷ 450 min = 324 ÷ 450 = 72.0%. Same answer.

That 324 minutes is the fully productive time — the time that, at ideal speed, would have produced exactly the good parts you got. The other 126 minutes of the 450 were lost:

Loss Minutes Share of planned time
Availability loss (stops) 450 − 396 = 54 12%
Performance loss (slow running, short stops) 396 − 333 = 63 14%
Quality loss (rejects) 333 − 324 = 9 2%
Fully productive time 324 72%
Total 450 100%

Notice that performance loss (63 minutes) is bigger than the breakdown and changeover combined. That is common: the stops get logged, but the slow running and short stops usually do not.

Example If an hour of this machine's time is worth ₹6,000 in contribution, the 126 lost minutes (2.1 hours) cost about ₹12,600 a shift. Over 50 shifts a month that is roughly ₹6.3 lakh — which is why it pays to know which of the three losses to attack first.

What are the six big losses?

The six big losses, also from TPM, are the usual causes behind each OEE factor. Classifying every lost minute into one of them is what turns OEE from a score into an action list.

OEE factor Big loss Typical examples
Availability Equipment failure Breakdowns, tooling failure, unplanned maintenance
Availability Setup and adjustments Changeovers, first-off approval, warm-up
Performance Idling and minor stops Jams, sensor trips, operator away for a minute, waiting for a crate
Performance Reduced speed Running below rated speed, worn tooling, cautious operators
Quality Process defects Scrap and rework during steady running
Quality Reduced yield Rejects during start-up or after a changeover

Setup loss is usually the quickest to cut — see our guide to reducing changeover time with SMED. Breakdowns and minor stops are covered in how to reduce machine downtime, and quality losses in how to reduce rejection rate.

What is a good OEE? Is 85% world class?

The 85% "world-class" figure is widely cited and is usually attributed to Nakajima's TPM work. It is normally broken down as:

Factor World-class benchmark
Availability 90%
Performance 95%
Quality 99.9%
OEE 0.90 × 0.95 × 0.999 ≈ 85%

Treat it as a reference point, not a target to hit next quarter. A high-volume, single-product line and a job shop running twenty part numbers a day will never look the same. What matters more is:

  • Your own trend. A machine going from 55% to 65% has gained almost a fifth more good output from the same asset.
  • The bottleneck's OEE. Raising OEE on a machine that is not the constraint does not raise plant output. Find the constraint first with how to identify bottlenecks in production.
  • Which factor is weakest. Low availability and low performance need very different fixes.

Note Plants that start measuring OEE honestly almost always see a lower number than they expected. That is normal. The first number is a baseline, not a verdict.

How do you calculate OEE in Excel?

Put the raw inputs in column B and let the formulas do the rest. One row per machine per shift works well; add a date and machine column if you keep a log.

Cell Label Value or formula
B2 Shift length (min) 480
B3 Planned breaks (min) 30
B4 Stop time (min) 54
B5 Ideal cycle time (min per part) 0.5
B6 Total count 666
B7 Good count 648
B8 Planned production time =B2-B3
B9 Run time =B8-B4
B10 Availability =B9/B8
B11 Performance =(B5*B6)/B9
B12 Quality =B7/B6
B13 OEE =B10*B11*B12

Format B10 to B13 as percentages. If performance ever shows above 100%, your ideal cycle time is set too slow; it does not mean the machine beat its best.

To combine several shifts or machines, do not average the OEE percentages. Add up the planned time, run time, total count and good count first, then calculate OEE from the totals. Averaging gives a short, lightly loaded shift the same weight as a full one.

What are the common OEE mistakes?

  1. Calling changeovers "planned" and leaving them out. They are planned, but they are still lost time. Only genuinely non-production time (no orders, scheduled holidays, agreed breaks) should come out of planned production time.
  2. Using a soft ideal cycle time. If the "ideal" is really a comfortable target, performance looks great and the slow-running loss disappears from view.
  3. Counting rework as good. Quality should count only parts that were right the first time.
  4. Relying on end-of-shift memory. Hand-written logs capture long breakdowns but miss the dozens of one- and two-minute stops that make up most performance loss.
  5. Chasing the score instead of the losses. OEE is a way to find lost time. If people are judged only by the number, they start reclassifying losses instead of removing them.
  6. Measuring every machine with equal effort. Start with the bottleneck and the machines that cost you the most.

What is the difference between OEE and TEEP?

OEE measures effectiveness during the time you planned to run. TEEP (Total Effective Equipment Performance) measures it against all the time there is — 24 hours a day, 365 days a year.

TEEP = OEE × Utilisation, where Utilisation = Planned production time ÷ All time.

In the example above, if the plant runs only that one shift a day, utilisation is 450 ÷ 1,440 minutes = 31.25%, so TEEP is 72% × 31.25% = 22.5%. OEE tells you how well you use the shift; TEEP tells you how much hidden capacity sits in the hours you are not running at all — useful before you buy another machine.

How can you measure OEE automatically with the cameras you already have?

The hard part of OEE is not the maths. It is getting honest, minute-by-minute data on when machines stopped, for how long and why — especially the short stops and slow running that never reach the log book.

OCCULAX uses the CCTV cameras already installed on your floor, connecting to your existing RTSP or NVR streams, so there is no new hardware to buy. It learns your factory's operating patterns, takt times and standard cycle baselines, and tracks six factory vitals: machine uptime, people, flow, quality, safety and housekeeping. The result is one Factory Health Score with the rupee impact and the areas to improve, on your phone. Video stays on an on-premise gateway with no external video storage. See how it works or read the FAQ.

Frequently asked questions

What is the formula for OEE?

OEE = Availability × Performance × Quality. Equivalently, OEE = (good count × ideal cycle time) ÷ planned production time.

What is a good OEE percentage?

85% is the widely cited world-class benchmark, built from 90% availability, 95% performance and 99.9% quality. For most plants, steady improvement on the bottleneck matters more than hitting 85%.

How do you calculate OEE for a whole line or plant?

Add up planned time, run time, total count and good count across all machines or shifts, then calculate OEE from those totals. For a line, the OEE of the bottleneck machine is usually the most meaningful single figure.

Why is my OEE performance above 100%?

Your ideal cycle time is set too slow. Reset it to the machine's real best sustained rate and performance will fall back below 100%.

Are changeovers included in OEE?

Yes. Changeover and setup time count as availability loss, even when they are scheduled, because the machine is not producing during them.

What is the difference between OEE and TEEP?

OEE measures effectiveness during planned production time only. TEEP multiplies OEE by utilisation, so it measures effectiveness against all calendar time and shows capacity hidden in unscheduled hours.

Want to see your machines' real uptime without a spreadsheet? Start a 14-day pilot — no hardware and no downtime.

  • OEE
  • Manufacturing
  • Machine uptime
  • TPM
  • Productivity
14-day pilot

See your factory's true number

Occulax connects to the cameras you already have and gives you one Factory Health Score — no new hardware, no downtime.

Start a Pilot
How to Calculate OEE: Formula, Example and Benchmarks — Occulax